> For the complete documentation index, see [llms.txt](https://ai-os-and-trend-finder.gitbook.io/ai-os-and-trend-finder-docs/llms.txt). Markdown versions of documentation pages are available by appending `.md` to page URLs; this page is available as [Markdown](https://ai-os-and-trend-finder.gitbook.io/ai-os-and-trend-finder-docs/.spec_system/archive/sessions/phase25-session06-active-mission-rail-progress/implementation-notes.md).

# Implementation Notes

**Session ID**: `phase25-session06-active-mission-rail-progress` **Started**: 2026-06-08 16:20 **Last Updated**: 2026-06-08 16:37

***

## Session Progress

| Metric              | Value   |
| ------------------- | ------- |
| Tasks Completed     | 20 / 20 |
| Estimated Remaining | 0 hours |
| Blockers            | 0       |

***

### Task T020 - Run focused tests, typecheck, lint, ASCII validation, and manual desktop/mobile rail overflow review

**Started**: 2026-06-08 16:33 **Completed**: 2026-06-08 16:37 **Duration**: 4 minutes

**Notes**:

* Ran focused tests: `bunx vitest run src/lib/__tests__/hermes-mission-progress.test.ts src/components/hermes/__tests__/hermes-mission-control.test.tsx`.
* Result: 2 files passed, 43 tests passed.
* Ran `bun run typecheck`; result passed.
* Ran `bun run lint`; initial run found Prettier-only formatting issues, then `bunx prettier --write` was run on the touched TypeScript files and lint passed.
* Ran `git diff --check`; result passed.
* Ran ASCII and LF validation across session-touched files; result passed.
* Started Vite on `http://127.0.0.1:5190/` because port 5189 was already in use.
* Opened `/agents/hermes`, selected the Mission tab, and reviewed the active rail at 1440x1000 and 390x844.
* Browser overflow review: desktop document overflow 0 px, mobile document overflow 0 px, and no rail children exceeded rail bounds.
* Screenshots captured at `/tmp/aios-rail-review/hermes-rail-desktop.png` and `/tmp/aios-rail-review/hermes-rail-mobile.png`.

**Files Changed**:

* `.spec_system/specs/phase25-session06-active-mission-rail-progress/implementation-notes.md` - recorded final gate output.
* `.spec_system/specs/phase25-session06-active-mission-rail-progress/security-compliance.md` - recorded verification status.
* `.spec_system/specs/phase25-session06-active-mission-rail-progress/tasks.md` - marked the session checklist complete.

**BQC Fixes**:

* Accessibility and platform compliance: final tests and browser review covered keyboard navigation, reduced-motion confetti gating, and mobile/desktop overflow.
* Contract alignment: final tests, typecheck, and lint passed without introducing bridge or contract changes.

***

### Task T019 - Extend component tests for prev/next, keyboard navigation, detail/copy/tick actions, reduced-motion behavior, and Claude Code parity

**Started**: 2026-06-08 16:32 **Completed**: 2026-06-08 16:33 **Duration**: 1 minute

**Notes**:

* Added component tests for prev/next controls, direct goal selection, Home/End keyboard navigation, rail detail open, rail copy duplicate prevention, rail tick duplicate prevention, reduced-motion confetti gating, and Claude Code rail labels.
* Ran `bunx vitest run src/components/hermes/__tests__/hermes-mission-control.test.tsx`.
* Result: 1 file passed, 31 tests passed.

**Files Changed**:

* `src/components/hermes/__tests__/hermes-mission-control.test.tsx` - added rail navigation, action, reduced-motion, and Claude Code parity coverage.

**BQC Fixes**:

* Duplicate action prevention: tests assert rail copy and tick controls do not duplicate in-flight actions.
* Accessibility: tests assert pointer and keyboard rail navigation behavior.
* Accessibility and platform compliance: tests assert reduced-motion users do not receive confetti from rail tick completion.

***

### Task T018 - Extend component tests for rail rendering above the grid, exact progress geometry, and full-grid preservation

**Started**: 2026-06-08 16:29 **Completed**: 2026-06-08 16:32 **Duration**: 3 minutes

**Notes**:

* Added Mission Control component coverage for rail placement before the full mini-goal grid.
* Added representative exact progress geometry assertions for 1/3 and 3/4 completion ratios.
* Added full-grid preservation assertions through the grid label and duplicated rail/grid detail affordances.
* Guarded rail `scrollIntoView` for test and browser compatibility when the method is unavailable.
* Ran `bunx vitest run src/components/hermes/__tests__/hermes-mission-control.test.tsx`.
* Result: 1 file passed, 27 tests passed.

**Files Changed**:

* `src/components/hermes/__tests__/hermes-mission-control.test.tsx` - added rail placement, progress geometry, and full-grid preservation coverage.
* `src/components/hermes/hermes-mission-goal-rail.tsx` - guarded selected-goal scroll positioning when `scrollIntoView` is unavailable.

**BQC Fixes**:

* Failure path completeness: rail scroll behavior now safely no-ops in environments without `scrollIntoView`.
* Contract alignment: tests assert exact geometry separately from rounded labels.

***

### Task T017 - Write unit tests for exact progress ratios, display rounding, milestone positions, empty/all-done missions, and current-goal selection

**Started**: 2026-06-08 16:28 **Completed**: 2026-06-08 16:29 **Duration**: 1 minute

**Notes**:

* Added focused unit tests for exact/display progress, CSS percent values, milestone positions, empty missions, deterministic sorting, first queued selection, preferred selection, invalid preferred fallback, all-done fallback, and empty selection.
* Ran `bunx vitest run src/lib/__tests__/hermes-mission-progress.test.ts`.
* Result: 1 file passed, 12 tests passed.

**Files Changed**:

* `src/lib/__tests__/hermes-mission-progress.test.ts` - added helper unit coverage.

**BQC Fixes**:

* Contract alignment: tests assert status-driven completion, sorted goal order, and selection fallback behavior.

***

### Task T016 - Confirm Hermes and Claude Code presentation parity for rail labels, actor labels, progress display, and shared action behavior

**Started**: 2026-06-08 16:29 **Completed**: 2026-06-08 16:29 **Duration**: 1 minute

**Notes**:

* Confirmed the rail consumes the parent presentation `actorLabels`, so Hermes shows `hermes` and Claude Code shows `Claude Code` for agent-owned goals.
* Confirmed copy labels are generated by the existing Mission Control copy label helper for each route presentation.
* Confirmed progress display and geometry are route-neutral and contract-neutral.
* Confirmed no new bridge behavior, endpoint, storage path, or mission contract field was added.

**Files Changed**:

* `src/components/hermes/hermes-mission-control.tsx` - parent passes route presentation labels and existing action callbacks to the rail.
* `src/components/hermes/hermes-mission-goal-rail.tsx` - rail renders presentation labels from props only.

**BQC Fixes**:

* Contract alignment: Hermes and Claude Code share the same typed rail behavior; presentation differences remain prop-driven.

***

### Task T015 - Add route-scoped rail, scrollbar, progress animation, responsive sizing, text wrapping, and reduced-motion fallback styles

**Started**: 2026-06-08 16:28 **Completed**: 2026-06-08 16:29 **Duration**: 1 minute

**Notes**:

* Added route-scoped rail, progress, milestone, selector, and scrollbar styles under `.hermes-agent-route`.
* Added a flowing progress gradient using existing Hermes/Claude Code route tokens.
* Added responsive selector sizing and overflow wrapping so long rail labels stay bounded.
* Added reduced-motion fallbacks for the progress animation and selector scroll behavior.

**Files Changed**:

* `src/styles.css` - added route-scoped rail styling, progress animation, milestone ticks, scrollbar styling, responsive constraints, and reduced-motion rules.

**BQC Fixes**:

* Accessibility and platform compliance: reduced-motion preference disables rail animation.
* State/layout safety: selector buttons use bounded width and overflow wrapping to prevent horizontal document overflow.

***

### Task T014 - Preserve full grid scan behavior, card action parity, actor pills, estimates, status display, and reduced-motion-safe confetti behavior

**Started**: 2026-06-08 16:28 **Completed**: 2026-06-08 16:28 **Duration**: 1 minute

**Notes**:

* Kept the existing full mini-goal cards below the new rail.
* Added a compact section label and `aria-label` for the full grid so component tests can assert the scan view remains available.
* Preserved the existing `GoalCard` action, actor, estimate, status, and tick/copy props.
* Did not change the existing reduced-motion confetti guard in `handleTick`.

**Files Changed**:

* `src/components/hermes/hermes-mission-control.tsx` - wrapped the full goal grid with a scan label and accessible grid label while preserving existing card rendering.

**BQC Fixes**:

* Accessibility: full scan grid has an explicit accessible label.
* Contract alignment: existing grid action path remains unchanged.

***

### Task T013 - Implement milestone-aligned gradient progress bar using exact CSS width values and rounded display text only

**Started**: 2026-06-08 16:27 **Completed**: 2026-06-08 16:28 **Duration**: 1 minute

**Notes**:

* Progress fill now receives the exact helper CSS percent as its inline width and parent custom property.
* Milestone ticks receive exact helper CSS percent as both a custom property and inline left position.
* Rounded display percentage is isolated to visible labels and a `data-progress-display` attribute for tests.

**Files Changed**:

* `src/components/hermes/hermes-mission-goal-rail.tsx` - made progress fill and milestone geometry exact and testable.

**BQC Fixes**:

* Contract alignment: exact geometry and rounded display labels are separated in markup.

***

### Task T012 - Implement one-goal focus, prev/next controls, direct goal selection, keyboard navigation, and revalidation

**Started**: 2026-06-08 16:27 **Completed**: 2026-06-08 16:27 **Duration**: 1 minute

**Notes**:

* Confirmed the integrated rail focuses one goal at a time above the full grid.
* Prev/next controls, direct goal selector buttons, Arrow/Home/End keyboard navigation, and selected-goal scroll positioning are implemented in the rail.
* Selection revalidates when mission identity or projected goal status signature changes.

**Files Changed**:

* `src/components/hermes/hermes-mission-goal-rail.tsx` - rail focus, navigation, and revalidation behavior.

**BQC Fixes**:

* State freshness on re-entry: goal selection resets to the helper-selected current goal when mission identity or statuses change.
* Accessibility: focused rail has labeled controls for pointer and keyboard navigation.

***

### Task T011 - Wire rail detail, copy, and tick controls to existing Mission Control handlers with duplicate-trigger prevention

**Started**: 2026-06-08 16:26 **Completed**: 2026-06-08 16:27 **Duration**: 1 minute

**Notes**:

* Confirmed the rail receives the existing Mission Control `onDetail`, `onCopy`, and `onTick` callbacks from `ActiveMissionPanel`.
* Rail copy buttons use the same copy label builder as grid cards and disable while any goal copy is in flight.
* Rail tick buttons use the parent `canEdit`, focused done state, and focused ticking state; the parent `canEdit` already includes the Mission Control busy action guard.
* Added an explicit `isTickDisabled` variable for the focused action button.

**Files Changed**:

* `src/components/hermes/hermes-mission-control.tsx` - rail passes existing parent handlers.
* `src/components/hermes/hermes-mission-goal-rail.tsx` - made focused tick disabled state explicit.

**BQC Fixes**:

* Duplicate action prevention: rail copy and tick controls are disabled using the same in-flight state as existing Mission Control actions.
* Trust boundary enforcement: rail writes remain hook-mediated through parent handlers.

***

### Task T010 - Render the active mission rail above the existing full mini-goal grid with parent state preservation

**Started**: 2026-06-08 16:26 **Completed**: 2026-06-08 16:26 **Duration**: 1 minute

**Notes**:

* Rendered `HermesMissionGoalRail` in `ActiveMissionPanel` after mission metrics and before the full mini-goal grid.
* Kept the parent state branches unchanged: state copy still owns idle/loading/error/offline/token-failure, empty mission still renders `EmptyMissionPanel`, and demo active missions continue through the existing active panel path.
* The full grid remains below the rail for scanning.

**Files Changed**:

* `src/components/hermes/hermes-mission-control.tsx` - imported and rendered the rail above the full goal grid.

**BQC Fixes**:

* State freshness on re-entry: parent branch ownership is unchanged, so existing re-entry resets still apply before the rail mounts.

***

### Task T009 - Replace rounded mission metric geometry with exact progress helper while preserving rounded labels

**Started**: 2026-06-08 16:25 **Completed**: 2026-06-08 16:26 **Duration**: 1 minute

**Notes**:

* Replaced the local rounded Mission Control progress helper with `calculateHermesMissionProgress`.
* Mission metric labels and archive chips use rounded `displayPercent`.
* The existing metric progress bar now receives exact decimal `exactPercent` for geometry.
* Existing deterministic goal sorting now delegates to `sortHermesMissionGoals`.

**Files Changed**:

* `src/components/hermes/hermes-mission-control.tsx` - switched metrics and archive progress labels to the new exact helper.

**BQC Fixes**:

* Contract alignment: Mission Control uses the same pure progress helper as the rail.
* Failure path completeness: no new runtime path was added; existing empty-goal handling returns zero progress.

***

### Task T008 - Add route-scoped rail class names and CSS custom property contract for progress fill and milestone ticks

**Started**: 2026-06-08 16:25 **Completed**: 2026-06-08 16:25 **Duration**: 1 minute

**Notes**:

* Added `hermes-mission-rail` element classes and BEM-style rail descendants for route-scoped styling.
* Added `--hermes-rail-progress-fill` for exact fill width and `--hermes-rail-milestone-left` for milestone positions.
* Added progress and milestone data attributes so focused tests can assert exact geometry without relying on rounded display text.

**Files Changed**:

* `src/components/hermes/hermes-mission-goal-rail.tsx` - added route-scoped class names, exact progress CSS custom properties, and milestone tick markup.

**BQC Fixes**:

* Contract alignment: component exposes exact helper values for CSS geometry while rounded labels remain display-only.

***

### Task T007 - Define rail keyboard, scroll, and selection state with cleanup on scope exit

**Started**: 2026-06-08 16:24 **Completed**: 2026-06-08 16:25 **Duration**: 1 minute

**Notes**:

* Added rail-local selected goal state that resets to the first queued goal, or final goal when all goals are done, when mission identity or projected statuses change.
* Added prev/next controls, direct selector buttons, and Arrow/Home/End keyboard navigation.
* Added horizontal selector scroll tracking and selected-goal scroll-into-view with reduced-motion-aware behavior.
* Added explicit cleanup for the acquired scroll listener.

**Files Changed**:

* `src/components/hermes/hermes-mission-goal-rail.tsx` - added rail selection, keyboard navigation, direct goal selector, scroll bookkeeping, and cleanup.

**BQC Fixes**:

* Resource cleanup: scroll listener is removed on dependency change or unmount.
* State freshness on re-entry: selected goal id is reset when mission id or goal status signature changes.
* Accessibility: rail is keyboard reachable and direct goal buttons expose tab semantics.

***

### Task T006 - Create focused mission goal rail component shell with typed props, stable stage dimensions, and existing action callback boundaries

**Started**: 2026-06-08 16:23 **Completed**: 2026-06-08 16:24 **Duration**: 1 minute

**Notes**:

* Created a prop-driven rail shell that receives mission data, actor labels, projected tick status, and the parent detail/copy/tick callbacks.
* Added stable minimum dimensions for the rail and focused card so later navigation does not resize the active mission layout.
* Kept all admin and clipboard behavior outside the rail; the component only emits existing callback actions.

**Files Changed**:

* `src/components/hermes/hermes-mission-goal-rail.tsx` - added focused rail component shell with typed props and action boundaries.

**BQC Fixes**:

* Duplicate action prevention: shell disables copy while any copy is in flight and tick while the focused goal is ticking or unavailable.
* Trust boundary enforcement: rail consumes already typed mission contracts and does not parse bridge payloads.

***

### Task T005 - Add current-goal selection and deterministic sorted-goal helpers with contract-aligned types

**Started**: 2026-06-08 16:26 **Completed**: 2026-06-08 16:28 **Duration**: 2 minutes

**Notes**:

* Added deterministic `num` then `id` sorting for mission goals.
* Added current-goal selection that preserves a valid preferred goal, otherwise chooses the first queued goal, and falls back to the final goal when all goals are done.

**Files Changed**:

* `src/lib/hermes-mission-progress.ts` - added sorted-goal and current-goal selection helpers.

**BQC Fixes**:

* State freshness on re-entry: helper gives the rail a single path to revalidate stale selected goal ids.
* Contract alignment: helpers operate on the declared `HermesMissionGoal` contract.

***

### Task T004 - Create exact mission progress helper with raw percent, display percent, milestone positions, and empty-state handling

**Started**: 2026-06-08 16:23 **Completed**: 2026-06-08 16:26 **Duration**: 3 minutes

**Notes**:

* Added a pure mission progress helper returning exact percentage, rounded display percentage, CSS percentage string, done/total counts, and per-goal milestones.
* Empty missions return zero progress and no milestones.
* Goal completion uses exhaustive status handling so future status contract changes surface at compile time.

**Files Changed**:

* `src/lib/hermes-mission-progress.ts` - added exact progress and milestone projection helpers.

**BQC Fixes**:

* Contract alignment: goal status handling is exhaustive in the helper.

***

### Task T003 - Create security compliance scaffold for presentation-only mission projection and unchanged admin-gated writes

**Started**: 2026-06-08 16:21 **Completed**: 2026-06-08 16:22 **Duration**: 1 minute

**Notes**:

* Created the session security compliance scaffold.
* Captured the presentation-only scope, no-contract-change posture, unchanged admin gate expectations, and BQC risks before application code edits.

**Files Changed**:

* `.spec_system/specs/phase25-session06-active-mission-rail-progress/security-compliance.md` - added scoped security posture and verification log.

**BQC Fixes**:

* N/A - compliance artifact task.

***

### Task T002 - Create implementation notes scaffold for rail, progress, command output, and manual checks

**Started**: 2026-06-08 16:20 **Completed**: 2026-06-08 16:21 **Duration**: 1 minute

**Notes**:

* Created the session implementation notes scaffold with session metadata, progress metrics, startup evidence, and task logging sections.
* Included command evidence placeholders through the task log structure so later verification output can be recorded without changing the session format.

**Files Changed**:

* `.spec_system/specs/phase25-session06-active-mission-rail-progress/implementation-notes.md` - added the implementation log scaffold.

**BQC Fixes**:

* N/A - spec artifact task.

***

## Task Log

### 2026-06-08 - Session Start

**Environment verified**:

* [x] Prerequisites confirmed
* [x] Tools available
* [x] Directory structure ready
* [x] Active session resolved as `phase25-session06-active-mission-rail-progress`

***

### Task T001 - Verify Phase 25 prerequisites, analyzer state, Session 05 validation evidence, and active Mission Control file paths

**Started**: 2026-06-08 16:19 **Completed**: 2026-06-08 16:20 **Duration**: 1 minute

**Notes**:

* Ran `.spec_system/scripts/analyze-project.sh --json`; current phase is 25 and current session is `phase25-session06-active-mission-rail-progress`.
* Ran `.spec_system/scripts/check-prereqs.sh --json --env`; spec system, `jq`, and `git` passed.
* Confirmed Session 05 validation result is PASS and focused quality gates passed.
* Confirmed active Mission Control files and session PRD paths exist.

**Files Changed**:

* `.spec_system/specs/phase25-session06-active-mission-rail-progress/implementation-notes.md` - recorded startup evidence and T001 completion.

**BQC Fixes**:

* N/A - verification-only task.

***


---

# Agent Instructions
This documentation is published with GitBook. GitBook is the documentation platform designed so that both humans and AI agents can read, navigate, and reason over technical content effectively. Learn more at gitbook.com.

## Querying This Documentation
If you need additional information that is not directly available in this page, you can query the documentation dynamically by asking a question.

Perform an HTTP GET request on the current page URL with the `ask` query parameter, and the optional `goal` query parameter:

```
GET https://ai-os-and-trend-finder.gitbook.io/ai-os-and-trend-finder-docs/.spec_system/archive/sessions/phase25-session06-active-mission-rail-progress/implementation-notes.md?ask=<question>&goal=<endgoal>
```

`ask` is the immediate question: it should be specific, self-contained, and written in natural language.
`goal` is optional and describes the broader end goal you are ultimately trying to accomplish on behalf of the user. GitBook uses it to tailor the answer towards what is most useful for that goal.

The response will contain a direct answer to the question and relevant excerpts and sources from the documentation.

Use this mechanism when the answer is not explicitly present in the current page, you need clarification or additional context, or you want to retrieve related documentation sections.
